These percentages decrease based on interventions of members of project team in the LPS sessions. Features of proposed method are illustrated in a case example for tracking and control of modular projects.Ĭomparison between developed schedule and Monte Carlo simulation showed that baseline duration generated from simulation exceeds that produced by developed method by 12% and 10% for schedules with 50% and 90% confidence level, respectively. The developed method accounts for constraints of resources continuity and uncertainties associated with activity duration. The design embraces building information modelling and integrates last planner system (LPS), linear scheduling method (LSM) and critical chain project management (CCPM) to develop tracking and control procedures for modular construction projects. The purpose of this paper is to present a new method for project tracking and control of integrated offsite and onsite activities in modular construction considering practical characteristics associated with this type of construction.